An Australian consulting firm has commissioned EUC Engineering for a 12 month contract to conduct Critical Risk Assessments for seven Pilbara sites associated with iron ore production including ports, power generation stations and electricity transmission and distribution system sites.  For more information about this project call Mike Dean on +61 (08) 9226 1226.

EUC Engineering has been given the job of completing a HAZOP of a train loading facility. Contact Mike Dean on +61 (08) 9226 1226 for more information on this project or if you would like to know more about HAZIDs, Risk Assessments and HAZOPs.

EUC Engineering has been given the job of reviewing a Hazardous Area Classification for a centrifuge project treating bio-sludge from municipal waste treatment. Contact Mike Dean on +61 (08) 9226 1226 for more information on this project or if you would like to know more about Hazardous Area Classification, Risk Assessments and HAZOPs.

EUC Engineering has been given the job of conducting a Hazard Identification, Risk Assessment and SIL Determination for a new centrifuge for drying of sludge generated during municipal waste treatment. The work required compliance to both AS IEC 61511 (process safety aspects) and AS 62061 (machinery safety aspects).  Contact Mike Dean on +61 (08) 9226 1226 for more information on this project or if you would like to know more about Functional Safety, HAZIDs, Risk Assessments and SIL Determination.

EUC Engineering has been given the job of completing a Hazard Identification (HAZID), HAZOP & Risk Assessment workshop under a Safety In Design program for the design of an extended fixed plant workshop at a Pilbara minesite. The work was carried out on site and involved inspection and familiarisation with the existing workshop before the extension proceeded.  The deliverable item was a report.  Contact Mike Dean on +61 (08) 9226 1226 for more information on this project or if you would like to know more about HAZIDs, Risk Assessments and HAZOPs.